Monday 29 February 2016

Storyboard Changes

Here I created a presentation on Emaze demonstrating the changes I made from my storyboard to the real film. there is a lot of changes involved, especially with the introduction of new clips.



Powered by emaze

Tuesday 23 February 2016

Restricted Film Rating


I googled an image of the green screen at the start of every trailer so I didn't have to waste time creating my own. I decided to select my audience as a restricted audience. I decided to further investigate what a restricted audience really was so I went on to the Motion Picture Association of America website which is the US version of the BBFC. Here is some items I found on the website.

Music Choice

For Draft 1 and Draft 2 of my teaser trailer I was planning on making my own soundtrack for the movie using the applications software garageband. The reason I chose not to do this is because I did not have enough time to create it as the editing and post production process of my teaser trailer was taking up a large quantity of time. I then proceeded to search Audio Network for various tracks and I found the clip Lost Girl 2 which I thought suited my trailer. First of all because the story is basically of three lost girls. When editing my Draft 3 trailer I decided to pick a different soundtrack that could be a faster pace. I am currently researching for another that is perfectly suited to mu film teaser trailer.

https://www.audionetwork.com/browse/m/track/lost-girl-2_113161?keyword=lost%20girl%202

Monday 22 February 2016

Target Audience Feedback-Draft 1

Here I have uploaded a picture of my feedback which I gained from other members in my media class. Overall I think that the feedback I gained was very positive but helps me to improve my teaser trailer and hopefully my final outcome will be the best of my ability and achieve a high level.

Friday 19 February 2016

Teaser Trailer Changes

I created a slideshare of the changes I made between my first teaser trailer and my second. I can see a major change when I compare the two but there is still room for much needed changes.


Thursday 11 February 2016

First Draft - Teaser Trailer

This is the first draft of my Teaser Trailer created using the software known as Final Cut Pro.

Wednesday 10 February 2016

Filming Day

I decided to film my trailer over the course of several days, as I knew I could not fit it into one day. So the first day was Friday the 15th of January. This was a cold and snowy day which was perfect for me as on the other days I could film, the weather would most likely be sunny or raining. The next day I filmed was Thursday the 28th of January. This was a wet day but it did not interfere with my filming. This day consisted of filming by myself, and the shots did not include any visual characters. I knew what shots I wanted as I had planned it all out on my story board. The thrid day of filming only took one hour as I knew what had to be shot, and where. These shots were not included in the first draft of my teaser trailer due to deadlines not being met. This was on Monday the 15th of February. It was a lot later compared to the rest due to it being the only available day where all characters could attend. Here are some of the behind the scenes images of the first day of filming on 15/01/2016.